Lab planning · Design-build · Commissioning

Laboratories, engineered from first sketch to final certification.

Halvorn plans, designs, and builds research, QC, and clinical labs for teams who can’t afford a failed inspection. One contract covers the floor plan, the fume hoods, and the airflow report.

Laboratory with fume hoods and island benches

FIG. 01 — BSL-2 suite, Durham NC

4,200 SQ FT

12

YRS

Designing and building labs

1.8M

SQ FT

Laboratory space planned

240+

LABS

Commissioned and certified

0

FAILS

Failed final inspections since 2019

01

Disciplines

One accountable team for every layer of the lab.

No hand-offs between an architect, a casework vendor, and a balancing contractor. Every system is drawn, priced, and warrantied under one stamp.

A-01

Lab planning & programming

Bench counts, adjacencies, and growth scenarios mapped to your workflow before a wall is drawn.

A-02

Architecture & MEP engineering

Stamped drawings for gases, power, plumbing, and data, coordinated in one BIM model.

A-03

Casework & fume hoods

Steel, phenolic, and epoxy casework with ASHRAE 110-tested hoods sized to your chemistry.

A-04

Containment & cleanrooms

BSL-2 and BSL-3 suites, ISO 7–8 cleanrooms, pass-throughs, and biosafety cabinet layouts.

A-05

HVAC & exhaust

Pressure cascades, air change rates, and energy-recovery exhaust tuned to the room, not a rule of thumb.

A-06

Validation & commissioning

IQ/OQ documentation, airflow certification, and hands-on training before your team moves in.

02

Process

Four phases. One schedule. No surprises at sign-off.

01

WK 1–4

Program & concept

Workshops with your scientists and EHS lead produce a room data sheet for every space.

02

WK 5–12

Layout & engineering

Floor plans, elevations, and MEP drawings issued for permit with a fixed price.

03

WK 13–26

Build & install

Our crews handle demolition, utilities, casework, hoods, and controls on one schedule.

04

WK 27–30

Test, certify, train

Airflow and hood certification, IQ/OQ packages, and staff training before handover.

04

Site survey

Send us a floor plan. Get a feasibility sketch in ten business days.

Includes bench capacity, hood count, and a budget range, at no cost.