SVC

Services

Six disciplines, one stamped set of drawings.

Most lab projects fail at the hand-offs. We keep planning, engineering, casework, and certification inside one contract, so the airflow numbers on day one match the drawings you approved.

A-01

Lab planning

Lab planning & programming

We interview your scientists, map sample flow, and size every room before a wall moves. The result is a room data sheet that drives the rest of the job.

Deliverables

Space program & bench counts

Adjacency diagrams

Room data sheets

Budget range ± 10%

A-02

Design

Architecture & MEP engineering

Stamped architectural, mechanical, electrical, plumbing, and lab gas drawings coordinated in one BIM model, so clashes surface on screen and not on site.

Deliverables

Permit drawing set

Lab gas & RO/DI piping

Power and data plans

Clash-checked BIM model

A-03

Casework

Casework & fume hoods

Steel, phenolic, and mobile casework on a 6 in. planning grid, with hoods tested to ASHRAE 110 before they leave our shop.

Deliverables

Steel & phenolic casework

Epoxy and phenolic tops

Bypass, VAV, and acid hoods

Factory as-manufactured tests

A-04

Containment

Containment & cleanrooms

BSL-2 and BSL-3 suites, ISO 7–8 cleanrooms, and USP 797/800 compounding rooms with pass-throughs and gowning sized to your workflow.

Deliverables

Modular cleanroom walls

Pass-throughs & interlocks

Biosafety cabinet layouts

Gowning and airlock plans

A-05

HVAC

HVAC & exhaust

Pressure cascades, air change rates, and energy-recovery exhaust tuned to the room. We model it before we build it, then balance it to the number.

Deliverables

Pressure cascade design

Exhaust stack & fan sizing

VAV and lab controls

Energy-recovery options

A-06

Commissioning

Validation & commissioning

Airflow certification, IQ/OQ packages, and hands-on training before your team moves in. You get one binder that your auditors will actually read.

Deliverables

Hood & BSC certification

Room pressure verification

IQ/OQ documentation

Staff training sessions

02

Process

Four phases. One schedule. No surprises at sign-off.

01

WK 1–4

Program & concept

Workshops with your scientists and EHS lead produce a room data sheet for every space.

02

WK 5–12

Layout & engineering

Floor plans, elevations, and MEP drawings issued for permit with a fixed price.

03

WK 13–26

Build & install

Our crews handle demolition, utilities, casework, hoods, and controls on one schedule.

04

WK 27–30

Test, certify, train

Airflow and hood certification, IQ/OQ packages, and staff training before handover.

03

Codes & standards

Designed to the codes your inspector reads.

ASHRAE 110

Fume hood performance

Tracer-gas containment testing on every hood we install.

ANSI/AIHA Z9.5

Laboratory ventilation

Face velocity, exhaust, and air change criteria for lab rooms.

NFPA 45

Fire protection

Chemical quantities, egress, and hood placement by lab unit.

ISO 14644

Cleanroom classification

Particle counts and recovery testing for ISO 5–8 spaces.

USP 797 / 800

Sterile compounding

Pressure, ACH, and room layout for compounding pharmacies.

BMBL 6th ed.

Biosafety

Containment features for BSL-2 and BSL-3 suites.

NTS

Site survey

Not sure which disciplines you need?

Send a floor plan and a list of your processes. We return a scope sketch with the disciplines, a schedule, and a budget range in ten business days.

Response within 1 business day

Create a free website with Framer, the website builder loved by startups, designers and agencies.