SVC
Services
Six disciplines, one stamped set of drawings.
Most lab projects fail at the hand-offs. We keep planning, engineering, casework, and certification inside one contract, so the airflow numbers on day one match the drawings you approved.
A-01
Lab planning
Lab planning & programming
We interview your scientists, map sample flow, and size every room before a wall moves. The result is a room data sheet that drives the rest of the job.
Deliverables
Space program & bench counts
Adjacency diagrams
Room data sheets
Budget range ± 10%
A-02
Design
Architecture & MEP engineering
Stamped architectural, mechanical, electrical, plumbing, and lab gas drawings coordinated in one BIM model, so clashes surface on screen and not on site.
Deliverables
Permit drawing set
Lab gas & RO/DI piping
Power and data plans
Clash-checked BIM model
A-03
Casework
Casework & fume hoods
Steel, phenolic, and mobile casework on a 6 in. planning grid, with hoods tested to ASHRAE 110 before they leave our shop.
Deliverables
Steel & phenolic casework
Epoxy and phenolic tops
Bypass, VAV, and acid hoods
Factory as-manufactured tests
A-04
Containment
Containment & cleanrooms
BSL-2 and BSL-3 suites, ISO 7–8 cleanrooms, and USP 797/800 compounding rooms with pass-throughs and gowning sized to your workflow.
Deliverables
Modular cleanroom walls
Pass-throughs & interlocks
Biosafety cabinet layouts
Gowning and airlock plans
A-05
HVAC
HVAC & exhaust
Pressure cascades, air change rates, and energy-recovery exhaust tuned to the room. We model it before we build it, then balance it to the number.
Deliverables
Pressure cascade design
Exhaust stack & fan sizing
VAV and lab controls
Energy-recovery options
A-06
Commissioning
Validation & commissioning
Airflow certification, IQ/OQ packages, and hands-on training before your team moves in. You get one binder that your auditors will actually read.
Deliverables
Hood & BSC certification
Room pressure verification
IQ/OQ documentation
Staff training sessions
02
Process
Four phases. One schedule. No surprises at sign-off.
01
WK 1–4
Program & concept
Workshops with your scientists and EHS lead produce a room data sheet for every space.
02
WK 5–12
Layout & engineering
Floor plans, elevations, and MEP drawings issued for permit with a fixed price.
03
WK 13–26
Build & install
Our crews handle demolition, utilities, casework, hoods, and controls on one schedule.
04
WK 27–30
Test, certify, train
Airflow and hood certification, IQ/OQ packages, and staff training before handover.
03
Codes & standards
Designed to the codes your inspector reads.
ASHRAE 110
Fume hood performance
Tracer-gas containment testing on every hood we install.
ANSI/AIHA Z9.5
Laboratory ventilation
Face velocity, exhaust, and air change criteria for lab rooms.
NFPA 45
Fire protection
Chemical quantities, egress, and hood placement by lab unit.
ISO 14644
Cleanroom classification
Particle counts and recovery testing for ISO 5–8 spaces.
USP 797 / 800
Sterile compounding
Pressure, ACH, and room layout for compounding pharmacies.
BMBL 6th ed.
Biosafety
Containment features for BSL-2 and BSL-3 suites.
NTS
Site survey
Not sure which disciplines you need?
Send a floor plan and a list of your processes. We return a scope sketch with the disciplines, a schedule, and a budget range in ten business days.
Response within 1 business day